Result:The entire shipment arrived within 12 days, enabling the machines to return to operation on schedule. The contractor avoided penalties for project delays and praised Atlas Tech for its ability to coordinate complex supply logistics across multiple borders.
Result:The new pump extended operating life to over 3 years without major maintenance. This drastically reduced unplanned downtime and improved plant reliability. The client reported annual savings of more than €250,000, along with increased safety for operators.
Result:The bearings were delivered within 9 days. This rapid response helped the mining company avoid production cuts and ensured continuous ore delivery to its smelter. According to the client, the solution not only prevented losses but also demonstrated the value of having Atlas Tech as a supply chain partner with international reach.
Result:The new system reduced energy consumption by 22%, saving the company over €120,000 annually. In addition, the client lowered their CO₂ emissions footprint, aligning with corporate sustainability goals. The project paid for itself in less than 18 months.
Result:The packaging line achieved 18% higher throughput, downtime dropped by 30%, and the factory obtained ISO 22000 certification ahead of schedule. Thanks to Atlas Tech’s solution, the company now delivers products faster to retail chains and has a scalable automation platform for future growth.
Result:The pump was delivered and installed in just 6 days. The plant resumed operation far ahead of schedule, reducing potential downtime from a month to less than a week. The client estimated that avoiding extended production losses saved them over €750,000 and strengthened their trust in Atlas Tech as a critical response supplier.