Cases

Heavy Equipment Parts for Remote Project Site

Challenge:A construction contractor working on a large hydro project in Georgia urgently required spare parts for Komatsu excavators and Caterpillar bulldozers. The site was in a remote mountain region with difficult logistics, and standard delivery timelines of 4–6 weeks would have caused major project delays.

Result:The entire shipment arrived within 12 days, enabling the machines to return to operation on schedule. The contractor avoided penalties for project delays and praised Atlas Tech for its ability to coordinate complex supply logistics across multiple borders.

Custom Pump Solution for Chemical Plant

Challenge:A chemical producer in Western Europe needed a specialized pump to handle aggressive, highly corrosive fluids. The existing pump systems failed every 8–10 months, resulting in costly replacements and production interruptions.

Result:The new pump extended operating life to over 3 years without major maintenance. This drastically reduced unplanned downtime and improved plant reliability. The client reported annual savings of more than €250,000, along with increased safety for operators.

Supplying Critical Bearings for Mining Operations

Challenge:A mining operation in Scandinavia faced an urgent replacement need for SKF heavy-duty bearings used in rock crushers. The OEM quoted a 10-week lead time, which would have forced the mine to significantly reduce output, risking long-term contractual penalties.

Result:The bearings were delivered within 9 days. This rapid response helped the mining company avoid production cuts and ensured continuous ore delivery to its smelter. According to the client, the solution not only prevented losses but also demonstrated the value of having Atlas Tech as a supply chain partner with international reach.

Energy Savings with Compressed Air Optimization

Challenge:An automotive supplier in Central Europe was facing rising energy costs due to inefficient and outdated compressed air systems. Their existing compressors frequently ran at full load even when demand was low, wasting energy and increasing maintenance costs.

Result:The new system reduced energy consumption by 22%, saving the company over €120,000 annually. In addition, the client lowered their CO₂ emissions footprint, aligning with corporate sustainability goals. The project paid for itself in less than 18 months.

Smart Automation Upgrade for Food Packaging Line

Challenge:A food processing facility in Southern Europe needed to upgrade its outdated automation system to meet stricter food safety and efficiency regulations. The existing control system frequently failed, causing bottlenecks in packaging and delays in delivery to supermarkets. The management required a quick solution that would modernize the plant without stopping production for weeks.

Result:The packaging line achieved 18% higher throughput, downtime dropped by 30%, and the factory obtained ISO 22000 certification ahead of schedule. Thanks to Atlas Tech’s solution, the company now delivers products faster to retail chains and has a scalable automation platform for future growth.

Restoring Production with Emergency Spare Parts

Challenge:A major cement plant in Eastern Europe suffered an unexpected breakdown of a Bosch Rexroth hydraulic pump that powered the kiln feed system. The failure immediately stopped production, leading to daily losses exceeding €100,000. Local distributors informed the client that the replacement unit would take at least 4 weeks to arrive, which was unacceptable given the scale of the downtime.

Result:The pump was delivered and installed in just 6 days. The plant resumed operation far ahead of schedule, reducing potential downtime from a month to less than a week. The client estimated that avoiding extended production losses saved them over €750,000 and strengthened their trust in Atlas Tech as a critical response supplier.