Restoring Oil & Gas Operations in Vietnam

Challenge

A Vietnamese offshore oil platform experienced a sudden failure of an Emerson pressure transmitter used for wellhead monitoring. The local market offered only generic replacements that did not meet API safety standards. OEM delivery was quoted at 6–8 weeks, which posed a serious operational and safety risk.

Solution

Atlas Tech sourced the exact Emerson transmitter from its European partner stock, performed additional calibration checks through a certified lab in Singapore, and arranged express sea-air shipping via Hong Kong to shorten transit.

Result

The replacement was delivered in 12 days and installed without process interruption. The operator reported that Atlas Tech’s rapid response prevented potential shutdowns worth over $3M in lost output.