German‑Manufactured Pump Export to Spain

Challenge

A large paper mill in Valencia, Spain suffered a catastrophic failure of its main high‑pressure water pump during a critical production run and had just ten days to secure and install a replacement before a full shutdown threatened significant penalties.

Solution

Within 24 hours of the inquiry, our team located the exact Wilo high‑pressure pump in a certified German warehouse, arranged same‑day functional testing at our Milan partner lab under 120 bar conditions, and flew the unit from Frankfurt to Barcelona by Day 2. After customs clearance in Barcelona on Day 4, it was trucked overnight to Valencia, where our field engineer oversaw installation and commissioning alongside the mill’s technicians.

Result

The pump was online in nine days, avoiding a full shutdown, restoring 95% of mill capacity within 24 hours, and saving the client over €50,000 in lost‑production penalties.

Facing a similar equipment challenge?

Our team is ready to help. Whether it’s urgent sourcing, obsolete parts, or full system integration—submit your request today.

Request a Quote for Availability, Delivery Time, and Cost